.: +7(499) 240-5830,     +7(495) 221-6700
: +7(499) 240-4579; e-mail: ao@ecn.ru

16/2 Berezhkovskaya naberezhnaya,
121059 Moscow, Russia
Contacts rus eng
JSC ETN ELECTROTSENTRONALADKA

Far from the capital in the Turukhansky Territory

11/27/2008 
start!on the Noviy Urengoy's streetsfinished!

In October - November the PMD electric circuit installer team has mounted six transformers in the own need GTPP of Vankor deposit. Working at minus 25 degree temperature in spite of confusion that is inherit to all the erection sites of such a scale and where a lot of companies operate, our gays succeeded in performing the task that was given, in good time and quality.

Commencement of industrial development of Vankor deposit is scheduled at the end of 2008. By 2014 production in the field is forecasted up to 30 million tonnes of oil. Fulfillment of Russia international obligations on oil delivery to Asia-Pacific region countries via oil pipeline Eastern Sibir - Pacific Ocean depends directly upon realization of this project.

   


Copyright JSC ETN ELECTROTSENTRONALADKA, 2015.
16/2 Berezhkovskaya naberezhnaya, 121059 Moscow, Russia
Telephone: (499) 240-58-30, (495) 221-67-00